Slider is playing
DSE cafeteria

Dripping Springs Elementary Capital Improvements & Renovations

About the Project

The Dripping Springs Elementary capital improvements and renovation project will address several outdated components of the 37-year-old campus. The projects listed below will occur during the summer months from 2024 to 2025. 

Design & Construction Schedule

List of Projects

  • Window Replacement  

  • HVAC for Interior Systems

  • Plumbing Repair and Replacement

  • Ceilings (Acoustical ceiling system, grid/support)

  • Electrical and Lighting (Fixtures, controls, panels, switches, wire)

  • Paint

  • Flooring (Replace VCT with new resilient flooring)

  • Demolition of Existing Finish/System

  • Insulation (New energy-efficient insulation)

  • Building Fire Sprinkler System

  • Fire Lane

  • Building Wastewater Line Repair

  • Remove Wood Bridges and Replace with Permanent Solution

  • Remove Asphalt Basketball Courts and Replace with Concrete

  • Install Fire Loop around Building

  • Remodel Exterior Flex Room into Classroom

  • Replace Water Isolation Valves

  • Install Wall Tile to All Interior Hallway Walls

  • Replace Basketball Goals with Current DSISD Standard

Presentations

DSE Renovation details