List of Projects
Window Replacement
HVAC for Interior Systems
Plumbing Repair and Replacement
Ceilings (Acoustical ceiling system, grid/support)
Electrical and Lighting (Fixtures, controls, panels, switches, wire)
Paint
Flooring (Replace VCT with new resilient flooring)
Demolition of Existing Finish/System
Insulation (New energy-efficient insulation)
Building Fire Sprinkler System
Fire Lane
Building Wastewater Line Repair
Remove Wood Bridges and Replace with Permanent Solution
Remove Asphalt Basketball Courts and Replace with Concrete
Install Fire Loop around Building
Remodel Exterior Flex Room into Classroom
Replace Water Isolation Valves
Install Wall Tile to All Interior Hallway Walls