- Bond
- What's Proposed
-
2023 BOND PROJECTS
DISTRICT GROWTH PROJECTS - $136 MILLION
- Build Elementary School #6 (850 Student Capacity)
- Expand Sycamore Springs MS to 1,200 Student Capacity
- New Facility for Special Education 18+ Program
- Design Elementary School #7, Middle School #3, and High School #2
- Land for Future Facilities
- Classroom Portables
CAPITAL IMPROVEMENT & RENOVATION PROJECTS - $87.7 MILLION
- Security Updates for All Campuses
- Americans with Disabilities Act (ADA) Updates
- Capital Improvements & Renovations at Dripping Springs Elementary, Dripping Springs Middle School, and Dripping Springs High School (Detailed list below)
- Reconfigure Center for Learning & Innovation and Maker Space at Rooster Springs Elementary and Dripping Springs Elementary
- Update Sound and Lighting Systems at Several Campuses
- Replace Pressure Reducing Valves at Several Campuses
- 13 Replacement Buses for Aging Fleet
- Child Nutrition Services (Kitchen) Equipment Replacements
- Technology Infrastructure (Network, Servers, Firewall, AV)
DRIPPING SPRINGS ELEMENTARY CAPITAL IMPROVEMENTS & RENOVATIONS
- Window Replacement
- HVAC for Interior Systems
- Plumbing Repair and Replacement
- Ceilings (Acoustical ceiling system, grid/support)
- Electrical and Lighting (Fixtures, controls, panels, switches, wire)
- Paint
- Flooring (Replace VCT with new resilient flooring)
- Demolition of Existing Finish/System
- Insulation (New energy-efficient insulation)
- Building Fire Sprinkler System
- Fire Lane
- Building Wastewater Line Repair
- Remove Wood Bridges and Replace with Permanent Solution
- Remove Asphalt Basketball Courts and Replace with Concrete
- Install Fire Loop around Building
- Remodel Exterior Flex Room into Classroom
- Replace Water Isolation Valves
- Install Wall Tile to All Interior Hallway Walls
- Replace Basketball Goals with Current DSISD Standard
DRIPPING SPRINGS MIDDLE SCHOOL CAPITAL IMPROVEMENTS & RENOVATIONS
- Ceilings (Acoustical ceiling system, grid/support)
- Electrical and Lighting (Fixtures, controls, panels, switches, wire)
- Paint
- Flooring (Replace VCT with new resilient flooring)
- Demolition of Existing Finish/System
- Insulation (New energy-efficient insulation)
- Restrooms (Fixtures, Partitions)
- Replace Athletic Lockers
- Replace Auxiliary Gym Bleachers
- HVAC
- Lift Station Monitoring System with Call Out
- Remove and Replace Wall Tile in Bathrooms
- Install P-lam Panels to all Interior Hallway Walls
- Repair Foundation
- Repair Drainage in Courtyard
DRIPPING SPRINGS HIGH SCHOOL CAPITAL IMPROVEMENTS & RENOVATIONS
- Replace Approximately 120,000 SF of Roofing
- Replace Competition Gym Floor and Retrofit 3 Gyms with LED Lighting
- Repair Civil Site Issue at Tennis Courts
- Renovate Life Skills Area
- Renovate Health Science Classrooms
- Update Lockers in Main Building and Fieldhouse
- Outfit Lab Spaces for Chemistry