• 2023 BOND PROJECTS

    DISTRICT GROWTH PROJECTS - $136 MILLION 18+ Building18+ Program

    • Build Elementary School #6 (850 Student Capacity)
    • Expand Sycamore Springs MS to 1,200 Student Capacity
    • New Facility for Special Education 18+ Program
    • Design Elementary School #7, Middle School #3, and High School #2
    • Land for Future Facilities 
    • Classroom Portables

    CAPITAL IMPROVEMENT & RENOVATION PROJECTS - $87.7 MILLION

    • Security Updates for All Campuses
    • Americans with Disabilities Act (ADA) Updates
    • Capital Improvements & Renovations at Dripping Springs Elementary, Dripping Springs Middle School, and Dripping Springs High School (Detailed list below)
    • Reconfigure Center for Learning & Innovation and Maker Space at Rooster Springs Elementary and Dripping Springs Elementary
    • Update Sound and Lighting Systems at Several Campuses
    • Replace Pressure Reducing Valves at Several Campuses
    • 13 Replacement Buses for Aging Fleet
    • Child Nutrition Services (Kitchen) Equipment Replacements
    • Technology Infrastructure (Network, Servers, Firewall, AV)

     

    DRIPPING SPRINGS ELEMENTARY CAPITAL IMPROVEMENTS & RENOVATIONS DSE FloorsDSE WindownsDSE HVAC

    • Window Replacement  
    • HVAC for Interior Systems
    • Plumbing Repair and Replacement
    • Ceilings (Acoustical ceiling system, grid/support)
    • Electrical and Lighting (Fixtures, controls, panels, switches, wire)
    • Paint
    • Flooring (Replace VCT with new resilient flooring)
    • Demolition of Existing Finish/System
    • Insulation (New energy-efficient insulation)
    • Building Fire Sprinkler System
    • Fire Lane
    • Building Wastewater Line Repair
    • Remove Wood Bridges and Replace with Permanent Solution
    • Remove Asphalt Basketball Courts and Replace with Concrete
    • Install Fire Loop around Building
    • Remodel Exterior Flex Room into Classroom
    • Replace Water Isolation Valves
    • Install Wall Tile to All Interior Hallway Walls
    • Replace Basketball Goals with Current DSISD Standard

    DRIPPING SPRINGS MIDDLE SCHOOL CAPITAL IMPROVEMENTS & RENOVATIONS DSMS wallsDSMS LockersDSMS Foundation

    • Ceilings (Acoustical ceiling system, grid/support)
    • Electrical and Lighting (Fixtures, controls, panels, switches, wire)
    • Paint
    • Flooring (Replace VCT with new resilient flooring)
    • Demolition of Existing Finish/System
    • Insulation (New energy-efficient insulation)
    • Restrooms (Fixtures, Partitions)
    • Replace Athletic Lockers
    • Replace Auxiliary Gym Bleachers
    • HVAC
    • Lift Station Monitoring System with Call Out
    • Remove and Replace Wall Tile in Bathrooms
    • Install P-lam Panels to all Interior Hallway Walls
    • Repair Foundation
    • Repair Drainage in Courtyard

    DRIPPING SPRINGS HIGH SCHOOL CAPITAL IMPROVEMENTS & RENOVATIONS DSHS LightingLife SkillsDSHS roof

    • Replace Approximately 120,000 SF of Roofing
    • Replace Competition Gym Floor and Retrofit 3 Gyms with LED Lighting
    • Repair Civil Site Issue at Tennis Courts
    • Renovate Life Skills Area
    • Renovate Health Science Classrooms
    • Update Lockers in Main Building and Fieldhouse
    • Outfit Lab Spaces for Chemistry