• Elementary School #5 (Darden Hill Rd.)
    Budget: $37,500,000

    elementary5 front

    Scope of Work:

    Completed Work:

    • Architects gathered stakeholder input at community meetings; the input received will assist architects in creating schematic designs for the site and the building.
    • A site feasibility study was created showing possible locations of the elementary school, while leaving open the potential to add other buidlings on the site. The feasibility study was presented to the Board on Sept. 16, 2019.
    • Design Input Committee met throughout the fall of 2019 with the architects and representatives from the DSISD Facilities and Construction Department
    • Traffic studies
    • Schematic Design process led into the Design Development phase
    • Guaranteed Maximum Price (GMP) #1 and #2 approved
    • Erosion controls and sitework
    • Site clearing and grubbing
    • Building pad
    • Foundation drilled piers


    The school district and the county each have conducted traffic studies of this area. Based on the county’s plan to establish a traffic circle at the intersection of Sawyer Ranch Road and Darden Hill Road, and recommendations from the district and county project engineers, the entrance to Elementary #5 will align with the roundabout. Engineers currently are updating designs that will keep a large tree intact and maximize the traffic efficiency on Darden Hill Road; these will be posted when completed.

    Exterior Elementary #5


    Current Work:

    • Foundation work
    • Foundation underground plumbing and electrical rough in
    • Site storm sewer work
    • Site wastewater and water work
    • PEC - overhead power work
    • Building cast in place concrete retaining walls
    • Site stone retaining walls

    Next Steps:

    • Complete foundation work
    • Start concrete tilt wall panels
    • Finish site utilities
    • Start geothermal well drilling

    groundbreaking photo

    Groundbreaking Ceremony, June 22, 2020

     
    PRESENTATIONS AND UPDATES

    Update on Elementary #5 (9.4.19)

    Schematic Design Presentation (12.16.19)

    Design Update (1.21.20)


    Update on Elementary #5 (5.14.20)

    Neighborhood Meeting Presentation (6.2.20)

     