Facilities
- Facilities Overview
- 2014 Bond Program
-
2018 Bond Program
- Bond Advisory Committee
- High School Additions and Renovations
- Dripping Springs Elementary Renovations and Furniture Upgrades
- Athletic Improvements (Turf/Track Replacement)
- Rooster Springs Elementary Renovations
- DSISD Transportation Site and Building Improvements
- Walnut Springs Elementary Relocation/Dripping Springs Middle School Renovations
- Cypress Springs Elementary
- Administration Building Conversion of Walnut Springs Elementary
- Long-Range Facility Planning
- Dripping Springs ISD
- 2018 Bond Program
- Cypress Springs Elementary
-
Cypress Springs Elementary (Elementary #5 on Darden Hill Rd.)
Budget: $37,500,000
Actual Expenditures: $36,657,607Completed Work:
- Architects gathered stakeholder input at community meetings; the input received will assist architects in creating schematic designs for the site and the building.
- A site feasibility study was created showing possible locations of the elementary school, while leaving open the potential to add other buildings on the site. The feasibility study was presented to the Board on Sept. 16, 2019.
- Design Input Committee met throughout the fall of 2019 with the architects and representatives from the DSISD Facilities and Construction Department
- Traffic studies
- Schematic Design process led into the Design Development phase
- Guaranteed Maximum Price (GMP) #1 and #2 approved
- Erosion controls and sitework
- Site clearing and grubbing
- Building pad
- Foundation drilled piers
- Site storm sewer work
- Building cast in place concrete retaining walls
- Site stone retaining walls
- Foundation work
- Site utilities
- Detention pond
- Wastewater septic field
- Geothermal loop well
- Tilt wall panels
- Structural steel work
- Geothermal wells
- Site dirt work
-
Site Final Grading and Paving
-
Stone veneer
-
Roofing
-
Exterior Windows
-
Sheetrock
-
Paint
-
Tile
-
Kitchen Equipment
PRESENTATIONS AND UPDATES
Update on Elementary #5 (9.4.19)
Schematic Design Presentation (12.16.19)
Design Update (1.21.20)
Update on Elementary #5 (5.14.20)
Neighborhood Meeting Presentation (6.2.20)